EDF Energy

Battery energy storage project

X

Please fill in the form below to begin your download

Case Study PDF Download

EDF Energy Renewables won a contract from National Grid to provide 49 MW of battery storage at its West Burton Combined Cycle Gas power station (WBB CCGT) in Nottinghamshire (the Existing Facility). It shall form part of a new [200 MW] enhanced frequency response system which will be deployed across the UK to balance the UK grid.

nmcn  successfully tendered to supply the full scope of works for Lot 2 – BOP Civils and Cabling Works.   Included in the nmcn package was all civils works associated with the battery supply system, namely foundations, battery bases, drainage and walkways. The supply and installation of the 6.6KV interconnecting cables and associated containment works.

Key Information

Project

Battery energy storage project

Client

EDF Energy

Value

£2m

Delivery Business Unit

Major Projects

Benefits at a Glance

Incident free delivery in live power environment
10% efficiency saving delivered to customer
Future designs influenced

Challenges

Owing to the live power station environment there are very high standards in relation to health and safety and these were understandably not relaxed in any way to allow for the construction works to take place. NMC embraced these standards and adopted them as part of their ways of working.

Solutions

The project itself was split into two lots by EDF. The first lot was awarded to German contractor NIDEC for the supply and installation of the battery storage units themselves. The second lot which was successfully secured by nmcn was awarded in  Q1 of 2017 before works started on site in the April.

nmcn worked collaboratively with EDF Energy & Renewables as well as NIDEC to ensure the project was delivered on time, to budget and to the required quality standards. In fact following a collaborative value engineering phase following tender award nmcn were able to deliver the Lot 2 works 10% more effectively than the tendered sum.

Results

nmcn delivered a quality, on time, on budget project with zero health and safety incidents. The success of the project is being used to influence future designs and efficiencies.

Testimonials

Every time I visited the project I found the staff helpful, engaged and open and it was good to see the whole project team taking up the challenge of delivering this together.

Donald Mackay, Director of Operations – EDF

Other Related Case Studies

Severn Trent Water

Ambergate Reservoir

Ambergate Service Reservoir at Fritchley has been an essential element of the water supply system to a significant number of customers in Derbyshire, Nottinghamshire and Leicestershire. It was first c...

Read the case study

Severn Trent Water

Gas to Grid Plant

nmcn were appointed by Clients Severn Trent Green Power to construct a biomethane gas to grid plant. The project based at Stoke Bardolph in Nottinghamshire turns gas produced from energy crops int...

Read the case study

Severn Trent Water

Heanor Breach Road Flood Alleviation Scheme

We completed the £1m Heanor Breach Road Flood Alleviation Scheme which will reduce the flooding witnessed by numerous properties on Breach Road, Heanor. The scheme works by quickly conveying the comb...

Read the case study